User Tools

Site Tools


projects

Differences

This shows you the differences between two versions of the page.


projects [2023/05/12 16:06] (current) – created - external edit 127.0.0.1
Line 1: Line 1:
 +====== On-going ======
 +
 +   * Development of an open smart manufacturing sharing platform linked to companies in the continuous process manufacturing industry, Ministry of SMEs and Startups (Contribution: Principal Investigator), Apr.29,2022 to May.31,2025.
 +\\ 
 +====== Finished ======
 +   * Study on self-organizing methodology of distributed manufacturing resources in smart factory, National Research Foundation(NRF) of Korea (Contribution: Principal Investigator), Jun.01,2018 to May.31,2022.
 +
 +   * Research and analysis on collaborative scheduling methods for hyper-connected collaboration infrastructrue of PNU-IFAM laboratory, Pusan National University (Contribution: Principal Investigator), Aug.14,2018 to Nov.30,2018.
 +
 +   * Development of manufacturing resource-organizing model for building a smart factory, Hanbat National University (Contribution: Principal Investigator), May.01,2017 to Feb.28,2018.
 +
 +   * Development of process simulation module, Korea Institute of Industrial Technology(KITECH) (Contribution: Principal Investigator), Jun.02,2017 to Jul.14,2017.
 +
 +   * Development of Technomatix framework to implement MES algorithm for remote material handling automation, Korea Atomic Energy Research Institute(KAERI) (Contribution: Principal Investigator), Mar.01,2015 to Feb.29,2016.
 +
 +   * Development of a process modeler and a production scheduler for Kimchi industry, Korea Institute of Industrial Technology(KITECH) (Contribution: Principal Investigator), Jan.01,2014 to Dec.31,2015.
 +
 +   * Development of core functions of production scheduler, Korea Institute of Industrial Technology(KITECH)(Contribution: Principal Investigator), Jun.4,2015 to Nov.30,2015.
 +   
 +   * Development of simulation-based virtual manufacturing system for TFT-LCD Fab, National Research Foundation(NRF) of Korea (Contribution: Principal Investigator), May.01,2012 to Apr.30,2015.
 +
 +   * Development of agent-based distributed production scheduling system(Phase 3), Space Solution Co., Ltd. (Contribution: Principal Investigator), Oct.20,2014 to Nov.30,2014.
 +
 +   * Development of agent-based simulation model for employment contract-driven fractal manufacturing system, Hanbat National University (Contribution: Principal Investigator), Sep.01,2013 to Aug.31,2014.
 +
 +   * Enhancement of simulation-based process modeling technology, Korea Association of Machinery Industry (Contribution: Principal Investigator), Mar.27,2014 to Jun.30,2014.
 +
 +   * Development of agent-based distributed production scheduling system(Phase 2), Space Solution Co., Ltd. (Contribution: Principal Investigator), Aug.20,2013 to Nov.15,2013.
 +
 +   * Development of reference model of manufacturing process and analysis function, Korea Institute of Industrial Technology(KITECH) (Contribution: Principal Investigator), Mar.26,2013 to Aug.31,2013.
 + 
 +   * Development of an assessment model of manufacturing capability and EMSS (as a part of i-Manufacturing Process Innovation Project), Korea Institute of Industrial Technology(KITECH) (Contribution: Investigator), Mar.01,2011 to Aug.31,2013.
 +
 +   * Planning research for divisional budget allocating to basic research programs and unit research funding by subject field, National Research Foundation(NRF) of Korea (Contribution: Investigator), Dec.01,2012 to Jun.30,2013.
 +
 +   * Development of agent-based distributed production scheduling system, Space Solution Co., Ltd. (Contribution: Principal Investigator), Sep.20,2012 to Dec.20,2012.
 +
 +   * Design of advanced planning and scheduling system, Korea Institute of Industrial Technology(KITECH) (Contribution: Principal Investigator), Aug.07,2012 to Nov.30,2012.
 +
 +  * Employment contract-driven fractal approach to production planning and scheduling for self-evolutionary manufacturing systems, Hanbat National University (Contribution: Principal Investigator), Sep.01,2011 to Aug.31,2012.
 +
 +  * Development of Augmented Manufacturing Technology and Integrated Manufacturing Knowledge Service Technology, Korea Institute of Industrial Technology(KITECH) (Contribution: Principal Investigator), Dec.24,2011 to Jan.27,2012.
 +  
 +  * Development of production scheduler tailored for small and medium sized enterprise, Korea Institute of Industrial Technology(KITECH) (Contribution: Principal Investigator), Sep.01,2011 to Dec.31,2011.
 + 
 +  * Development of scheduling algorithms based on loading simulation for LCD Fab of Samsung Electronics, VMS Solutions Co., Ltd. (Contribution: Principal Investigator), Jun.01,2011 to Sep.30,2011.
 +  
 +  * Development of self-evolutionary controller based on goal-driven negotiation model, Korea Research Foundation (Contribution: research assistant and core developer), Jan. 2007 to Dec. 2007.
 +  
 +  * Intelligent goal-formation process for the embodiment of self-evolutionary manufacturing systems, Korea Research Foundation (Contribution: research assistant and core developer), Dec. 2004 to Nov. 2005.
 +  
 +  * Dynamic restructuring process for the embodiment of self-reconfigurability in manufacturing systems, Korea Research Foundation (Contribution: research assistant), Dec. 2003 to Nov. 2004.
 +  
 +  * Development of RISD managing system using an intelligent agent, POSTECH (Contribution: research assistant), Sep. 2003 to Aug. 2004.
 +  
 +  * A plan for establishing RIS through self-sustaining localization, National Committee for Balanced Development (Contribution: research assistant), Sep. 2003 to Dec. 2003.
 +  
 +  * A feasibility study of the East-sea Marine Biology Research Complex, MOST (Contribution: research assistant), Nov. 2001 to Oct. 2002.
 +  
 +  * Development of a Methodology for Implementing Intelligent Controllers of Fractal Manufacturing Systems, KOSEF (Contribution: research assistant), Apr. 2001 to Mar. 2002.
 +  
 +  * Development of web-based 'O' ring test system, BioPlus Co. Ltd. (Contribution: research assistant), Feb. 2001 to Jan. 2002.
 +  
 +  * Real-Time Scheduler for Turbo FMS, TurboTek Co. Ltd. (Contribution: research assistant), Mar. 2000 to Aug. 2000.
 +\\ 
 +
 +----
  
projects.txt · Last modified: 2023/05/12 16:06 by 127.0.0.1